摘要: This study introduces a probabilistic risk assessment (PRA) framework against evaluating extreme wind hazards on floating nuclear power plants (FNPPs), extending conventional land-based nuclear plant methodologies through wind speed-based hazard curve development. We establish an integrated analytical approach incorporating 1) multi-source meteorological data integration, 2) coupled wind field modeling with extreme value theory, and 3) Bayesian uncertainty quantification. Hazard curves were systematically derived for three wind phenomena – straight-line winds, typhoons, and tornadoes – with consideration of their combination. The methodology advances inverse uncertainty quantification through Markov Chain Monte Carlo (MCMC) parameter calibration for typhoon and straight-line wind models, enabling probabilistic propagation of parameter uncertainties into hazard estimates. Tornado risk assessment integrates stochastic encounter modeling with classification error-adjusted conditional probabilities, enhanced through Bayesian updating techniques. Key findings reveal substantial epistemic uncertainties in low-probability hazard regions, primarily attributable to data sparsity in extreme wind records and empirical limitations of current wind field parameterizations. This work establishes a foundational methodology for marine nuclear infrastructure risk assessment while highlighting critical knowledge gaps in extreme wind characterization for floating systems.

版本历史

[V1] 2025-03-06 20:50:26 ChinaXiv:202503.00058V1 下载全文
点击下载全文
预览
同行评议状态
待评议
许可声明
metrics指标
  •  点击量2835
  •  下载量743
评论
分享
申请专家评阅
  • 运营单位: 中国科学院文献情报中心
  • 邮箱: eprint@mail.las.ac.cn
  • 地址:北京中关村北四环西路33号
招募志愿者 许可声明 法律声明

京ICP备05002861号-25 | 京公网安备11010802041489号
版权所有© 2016-2026 中国科学院文献情报中心